NATEC-Energo Project ltd

Year of establishment 2003
NATEC-Energo Project ltd is part of the NAТEC group since 2008
The board Chairman of The Board - Alexey Alexeev
Management CEO - Lyudmila Kabankova
Chief project engineer - Aleksandr Antonov
Head of gas supply department - Irina Kuraeva

In the team of NATEC-Energo Project ltd there work more than 70 highly qualified professionals with experience in the design of top-class facilities of electricity and heat as well as engineering infrastructure including those constructed in areas with particularly difficult geological and climatic conditions.
Directions of activity NATEC-Energo Project ltd specializes in development of design and estimate documentation.
The main activity of the Company is a comprehensive design of industrial, energy and infrastructure objects:
  • energy centers with a capacity of 15 - 200 MW;
  • industrial boilers;
  • transformer substations and cable networks with voltage up to 35 kV;
  • substations with a voltage of 110 - 220 kV;
  • electrical and heating networks;
  • gas pipelines.
The company has a tolerance and carries out the General design services including particularly hazardous production facilities.

NATEC-Energo Project ltd1 is the General designer of power plants for the APEC summit of 2012 on the Russky Island in the RF with a total of 4 CHP units.
Services
  • services development of the feasibility studies (FS) investment in the construction;
  • pre-feasibility and feasibility studies of technical solutions;
  • development of concepts of energy supply of objects of industrial and civil purpose;
  • development of design and estimate documentation including all key and special partitions required for passing state examination of the project, obtaining permission for construction and commissioning of the object;
  • support of the developed projects in regulating bodies, as well as passing the state examination of the project;
  • technical support and supervision of construction of the designed object.
  The company has a Certificate of SRO and provides services to the general design, including severely hazardous production facilities.
    